Discussion
The Town of Huntsville undertook a multi-phase program to better understand the condition and performance of its storm sewer system, which includes over 1,400 pipes and 34 km of infrastructure. Following extensive CCTV inspections, surveying, and GIS database development, the Town required a hydraulic model to be built to translate this data into a system-level assessment of capacity and performance. Key considerations included building a model directly from verified GIS and inspection data, generating runoff based on defined drainage areas, and evaluating system performance against specific operational criteria such as pipe capacity, velocity, and cover depth.
Based on these needs, PCSWMM was chosen to develop a detailed hydraulic model of the storm sewer network. The model incorporated Town and District infrastructure data, allowing the full connected system to be assessed in a single model. The contributing subcatchments were explicitly defined and parameterized utilizing spatial weighting tools and inputs such as soil type, impervious area, slope, and curve numbers. These inputs were used to generate runoff and route flows into the system through connected catchbasins and inlet structures, reflecting how rainfall enters and moves through the network.
The model was then used to simulate system performance under various design storm conditions, with evaluation focused on three specific criteria: minimum pipe cover (1.5 m), minimum velocity (0.6 m/s), and surcharging during the 10-year storm event. PCSWMM’s post processing enabled direct identification of deficiencies, including 119 pipes experiencing surcharge and a subset of pipes with velocities below the required threshold, indicating potential sedimentation and maintenance concerns.
PCSWMM enabled iterative scenario testing of system upgrades. Pipes identified as surcharged were selectively upsized within the model to determine the extent of improvements required to eliminate capacity issues. This analysis showed that 133 pipes (approximately 16% of the network) would need to be enlarged to resolve surcharging under the 10-year event.
The resulting model provided a clear, quantified understanding of system deficiencies and upgrade requirements, linking field data directly to hydraulic performance. PCSWMM was used as a practical and integrated platform to convert inspection and GIS data into a calibrated hydraulic model, define watershed-driven inputs, and test targeted infrastructure improvements, supporting informed, data-driven planning decisions for the Town.